Notes:
6/23/2026 10:31:12 AM
serving the fire hydrant on western side of 31St, including 6" WL, 2" WL and the tap for the property to the east of the site.
2. Remove existing lateral for the adjacent property to the east, from its point of connection to the main to the meter setter.
3. Abandon un-used 6" SS lateral at existing SSMH.
4. Tie-in to existing 6" WL @ tee, tap new 6" C900 WL for 1" replacement lateral to existing meter setter.
5. Install +/- 43 LF of new 6" C900 WL to R/W.
6. Tie-in to existing Storm MH and install +/- 26 LF of new 18" CL III RCP.
7. Tie-in to existing SSMH and install +/- 12 LF of new 6" SDR26 SS to new SSMH B at R/W.