Notes:
4/8/2024 8:55:36 AM
in the right of way Jefferson St for the Jefferson Street connector. Note this work will be contained within the construction fencing on the northside of Jefferson St as shown on attached site logistics plan. Demo curbs/sidewalks, excavate to working surface, install caissons pour pile caps and run storm line ( shown in red on site logistics.