| BI-WEEKLY EROSION AND SEDIMENT | 0 | APPROVED |
12/2/2024
| | 12/2/2024 | |
More Info
|
| FINAL BUILDING | 0 | APPROVED |
11/22/2024
| | 11/21/2024 | |
More Info
|
| FIELD CO SIGNOFF | 0 | APPROVED |
11/22/2024
| | 11/21/2024 | |
More Info
|
| FINAL CROSS CONNECT | 0 | APPROVED |
11/22/2024
| | 11/21/2024 | |
More Info
|
| INSPECTOR BUILDING REVIEW | 0 | APPROVED |
11/22/2024
| | 11/21/2024 | |
More Info
|
| FINAL CO SIGNOFF** | 0 | APPROVED |
11/22/2024
| | 11/22/2024 | |
More Info
|
| ZONING CO SIGN OFF | 0 | APPROVED |
11/22/2024
| | 11/22/2024 | AM |
More Info
|
| BUILDING CO SIGN OFF | 0 | APPROVED |
11/22/2024
| | 11/22/2024 | |
More Info
|
| FIELD CO SIGNOFF | 0 | PARTIAL APPROVED |
11/21/2024
| | 11/21/2024 | |
More Info
|
| FINAL BUILDING | 0 | PARTIAL APPROVED |
11/21/2024
| | 11/21/2024 | |
More Info
|
| FINAL CROSS CONNECT | 0 | PARTIAL APPROVED |
11/21/2024
| | 11/21/2024 | |
More Info
|
| FINAL BUILDING | 0 | PARTIAL APPROVED |
11/20/2024
| | 11/20/2024 | |
More Info
|
| FIELD CO SIGNOFF | 0 | PARTIAL APPROVED |
11/20/2024
| DAY | 11/20/2024 | |
More Info
|
| INSPECTOR BUILDING REVIEW | 0 | PARTIAL APPROVED |
11/20/2024
| | 11/20/2024 | |
More Info
|
| FINAL CROSS CONNECT | 0 | PARTIAL APPROVED |
11/20/2024
| | 11/20/2024 | |
More Info
|
| FINAL CROSS CONNECT | 0 | PARTIAL APPROVED |
11/19/2024
| | 11/19/2024 | |
More Info
|
| FIELD CO SIGNOFF | 0 | PARTIAL APPROVED |
11/19/2024
| DAY | 11/19/2024 | |
More Info
|
| INSPECTOR BUILDING REVIEW | 0 | PARTIAL APPROVED |
11/19/2024
| | 11/19/2024 | |
More Info
|
| FINAL BUILDING | 0 | PARTIAL APPROVED |
11/19/2024
| DAY | 11/19/2024 | |
More Info
|
| FINAL SITE | 0 | APPROVED |
11/18/2024
| DAY | 11/18/2024 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | PARTIAL COMPLIANCE |
11/13/2024
| | 11/15/2024 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | PARTIAL COMPLIANCE |
10/23/2024
| | 10/30/2024 | |
More Info
|
| INSULATION/ ENERGY | 0 | APPROVED |
10/10/2024
| DAY | 10/10/2024 | |
More Info
|
| LIGHTING | 0 | APPROVED |
10/9/2024
| DAY | 10/9/2024 | |
More Info
|
| SCREENING | 0 | APPROVED |
10/9/2024
| | 10/9/2024 | |
More Info
|
| FINAL SITE | 0 | DENIED |
10/9/2024
| | 10/9/2024 | |
More Info
|
| LANDSCAPING | 0 | APPROVED |
10/9/2024
| DAY | 10/9/2024 | |
More Info
|
| INSULATION/ ENERGY | 0 | CANCELLED |
10/4/2024
| PM | 10/4/2024 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | PARTIAL COMPLIANCE |
10/4/2024
| | 10/9/2024 | |
More Info
|
| INSULATION/ ENERGY | 0 | CANCELLED |
10/3/2024
| DAY | 10/3/2024 | |
More Info
|
| FINAL ELECTRIC | 0 | APPROVED |
9/25/2024
| DAY | 9/25/2024 | |
More Info
|
| FOOTING POST/PIER | 0 | APPROVED |
9/23/2024
| | 9/23/2024 | |
More Info
|
| FINAL PLUMBING | 0 | APPROVED |
9/20/2024
| DAY | 9/20/2024 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | IN COMPLIANCE |
9/20/2024
| | 9/20/2024 | |
More Info
|
| PARKING | 0 | APPROVED |
9/20/2024
| DAY | 9/20/2024 | |
More Info
|
| FIELD COMMENTS | 0 | INFORMATION |
9/20/2024
| | 9/20/2024 | |
More Info
|
| FINAL ELECTRIC | 0 | PARTIAL APPROVED |
9/20/2024
| DAY | 9/20/2024 | |
More Info
|
| FINAL HVAC | 0 | APPROVED |
9/20/2024
| DAY | 9/20/2024 | |
More Info
|
| GROUNDWORK ELECTRIC | 0 | APPROVED |
9/19/2024
| | 9/19/2024 | |
More Info
|
| ROUGH IN FRAMING | 0 | APPROVED |
9/19/2024
| | 9/19/2024 | |
More Info
|
| BRACE WALL | 0 | APPROVED |
9/19/2024
| | 9/19/2024 | |
More Info
|
| ROUGH IN HVAC | 0 | APPROVED |
9/18/2024
| DAY | 9/18/2024 | |
More Info
|
| ROUGH IN PLUMBING | 0 | APPROVED |
9/18/2024
| DAY | 9/18/2024 | |
More Info
|
| ROUGH IN ELECTRIC | 0 | APPROVED |
9/18/2024
| DAY | 9/18/2024 | |
More Info
|
| INSULATION/ ENERGY | 0 | PARTIAL APPROVED |
9/18/2024
| DAY | 9/18/2024 | |
More Info
|
| FOOTING POST/PIER | 0 | CANCELLED |
9/18/2024
| DAY | 9/18/2024 | |
More Info
|
| BONDING/ GROUNDING | 0 | APPROVED |
9/17/2024
| DAY | 9/17/2024 | |
More Info
|
| FINAL GAS | 0 | APPROVED |
9/17/2024
| DAY | 9/17/2024 | |
More Info
|
| INSPECTOR BUILDING REVIEW | 0 | DENIED |
9/11/2024
| | 9/11/2024 | |
More Info
|
| FIELD COMMENTS | 0 | DENIED |
9/11/2024
| | 9/10/2024 | |
More Info
|
| BONDING/ GROUNDING | 0 | DENIED |
9/11/2024
| | 9/11/2024 | |
More Info
|
| INSULATION/ ENERGY | 0 | PARTIAL APPROVED |
9/11/2024
| | 9/11/2024 | |
More Info
|
| FINAL PLUMBING | 0 | DENIED |
9/10/2024
| DAY | 9/10/2024 | |
More Info
|
| FINAL HVAC | 0 | DENIED |
9/10/2024
| | 9/10/2024 | |
More Info
|
| FINAL GAS | 0 | DENIED |
9/10/2024
| DAY | 9/10/2024 | |
More Info
|
| ROUGH IN FRAMING | 0 | DENIED |
9/10/2024
| | 9/10/2024 | |
More Info
|
| ROUGH IN ELECTRIC | 0 | DENIED |
9/10/2024
| | 9/10/2024 | |
More Info
|
| FOOTING POST/PIER | 0 | DENIED |
9/10/2024
| | 9/10/2024 | |
More Info
|
| BRACE WALL | 0 | INFORMATION |
9/10/2024
| | 9/10/2024 | |
More Info
|
| DRAINTILE/FND COATING | 0 | NOT REQUIRED |
9/10/2024
| | 9/10/2024 | |
More Info
|
| INTERCEPTOR-OIL/GRSE | 0 | NOT REQUIRED |
9/10/2024
| | 9/10/2024 | |
More Info
|
| FINAL ELECTRIC | 0 | DENIED |
9/10/2024
| DAY | 9/10/2024 | |
More Info
|
| FINAL BUILDING | 0 | DENIED |
9/10/2024
| DAY | 9/10/2024 | |
More Info
|
| FIELD COMMENTS | 0 | INFORMATION |
9/10/2024
| | 9/10/2024 | |
More Info
|
| LIGHTING | 0 | DENIED |
9/10/2024
| | 9/13/2024 | |
More Info
|
| PARKING | 0 | DENIED |
9/10/2024
| | 9/13/2024 | |
More Info
|
| SCREENING | 0 | DENIED |
9/10/2024
| | 9/13/2024 | |
More Info
|
| FOUNDATION STAKEOUT | 0 | NOT REQUIRED |
9/10/2024
| | 9/13/2024 | |
More Info
|
| FINAL SITE | 0 | DENIED |
9/10/2024
| | 9/13/2024 | |
More Info
|
| LANDSCAPING | 0 | PARTIAL APPROVED |
9/10/2024
| | 9/13/2024 | |
More Info
|
| SEWER SERVICE LATERAL | 0 | APPROVED |
9/10/2024
| | 9/10/2024 | |
More Info
|
| ROUGH IN PLUMBING | 0 | DENIED |
9/10/2024
| | 9/10/2024 | |
More Info
|
| ROUGH IN HVAC | 0 | DENIED |
9/10/2024
| | 9/10/2024 | |
More Info
|
| FINAL CROSS CONNECT | 0 | DENIED |
9/10/2024
| | 9/10/2024 | |
More Info
|
| GROUNDWORK ELECTRIC | 0 | DENIED |
9/10/2024
| | 9/10/2024 | |
More Info
|
| GROUNDWORK PLUMBING | 0 | APPROVED |
9/10/2024
| | 9/10/2024 | |
More Info
|
| FINAL HOOD | 0 | NOT REQUIRED |
9/10/2024
| | 9/10/2024 | |
More Info
|
| FINAL HOOD SUPRESS | 0 | NOT REQUIRED |
9/10/2024
| | 9/10/2024 | |
More Info
|
| FIRE MAIN FLUSH | 0 | NOT REQUIRED |
9/10/2024
| | 9/10/2024 | |
More Info
|
| FINAL FIRE ALARM | 0 | NOT REQUIRED |
9/10/2024
| | 9/10/2024 | |
More Info
|
| FINAL FIRE SITE | 0 | NOT REQUIRED |
9/10/2024
| | 9/10/2024 | |
More Info
|
| FINAL FIRE SUPRESS | 0 | NOT REQUIRED |
9/10/2024
| | 9/10/2024 | |
More Info
|
| ROUGH FIRE SUPRESS | 0 | NOT REQUIRED |
9/10/2024
| | 9/10/2024 | |
More Info
|
| ROUGH IN FIRE ALARM | 0 | NOT REQUIRED |
9/10/2024
| | 9/10/2024 | |
More Info
|
| ROUGH IN HOOD | 0 | NOT REQUIRED |
9/10/2024
| | 9/10/2024 | |
More Info
|
| FIRE MAIN HYDRO | 0 | NOT REQUIRED |
9/10/2024
| | 9/10/2024 | |
More Info
|
| FIRE MAIN LATERAL | 0 | NOT REQUIRED |
9/10/2024
| | 9/10/2024 | |
More Info
|
| HOOD DUCT LIGHT TEST | 0 | NOT REQUIRED |
9/10/2024
| | 9/10/2024 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | IN COMPLIANCE |
8/29/2024
| | 9/5/2024 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | IN COMPLIANCE |
8/15/2024
| | 8/15/2024 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | IN COMPLIANCE |
7/31/2024
| | 8/1/2024 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | IN COMPLIANCE |
7/16/2024
| | 7/17/2024 | |
More Info
|
| WATER SERVICE LAT | 0 | APPROVED |
7/3/2024
| 08:15 AM | 7/3/2024 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | PARTIAL COMPLIANCE |
6/20/2024
| | 7/2/2024 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | IN COMPLIANCE |
6/4/2024
| | 6/5/2024 | |
More Info
|
| SEWER SERVICE LAT | 0 | PARTIAL APPROVED |
6/3/2024
| DAY | 6/3/2024 | |
More Info
|
| INSULATION/ ENERGY | 0 | PARTIAL APPROVED |
5/31/2024
| | 5/31/2024 | |
More Info
|
| ELECTRIC SERVICE | 0 | APPROVED |
5/31/2024
| | 5/31/2024 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | IN COMPLIANCE |
5/21/2024
| | 5/21/2024 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | IN COMPLIANCE |
5/7/2024
| | 5/7/2024 | |
More Info
|
| ROUGH IN GAS | 0 | APPROVED |
5/3/2024
| DAY | 5/3/2024 | |
More Info
|
| ROUGH IN ELECTRIC | 0 | DENIED |
5/3/2024
| DAY | 5/3/2024 | |
More Info
|
| ROUGH IN PLUMBING | 0 | PARTIAL APPROVED |
4/29/2024
| DAY | 4/29/2024 | |
More Info
|
| ROUGH IN GAS | 0 | DENIED |
4/29/2024
| DAY | 4/29/2024 | |
More Info
|
| ROUGH IN ELECTRIC | 0 | DENIED |
4/29/2024
| DAY | 4/29/2024 | |
More Info
|
| ROUGH IN ELECTRIC | 0 | DENIED |
4/23/2024
| DAY | 4/23/2024 | |
More Info
|
| ROUGH IN GAS | 0 | DENIED |
4/23/2024
| DAY | 4/23/2024 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | IN COMPLIANCE |
4/23/2024
| | 4/23/2024 | |
More Info
|
| ROUGH IN HVAC | 0 | CANCELLED |
4/23/2024
| DAY | 4/24/2024 | |
More Info
|
| ROUGH IN PLUMBING | 0 | CANCELLED |
4/23/2024
| DAY | 4/24/2024 | |
More Info
|
| ROUGH IN FRAMING | 0 | DENIED |
4/23/2024
| DAY | 4/23/2024 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | PARTIAL COMPLIANCE |
4/9/2024
| | 4/9/2024 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | PARTIAL COMPLIANCE |
3/26/2024
| | 3/26/2024 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | PARTIAL COMPLIANCE |
3/11/2024
| | 3/12/2024 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | IN COMPLIANCE |
2/26/2024
| | 2/26/2024 | |
More Info
|
| STORM DRAIN INTERIOR | 0 | NOT REQUIRED |
2/13/2024
| AM | 2/13/2024 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | IN COMPLIANCE |
2/9/2024
| | 2/12/2024 | |
More Info
|
| SLAB PREP | 0 | APPROVED |
2/2/2024
| DAY | 2/2/2024 | |
More Info
|
| SLAB PREP | 0 | DENIED |
2/1/2024
| DAY | 2/1/2024 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | IN COMPLIANCE |
1/26/2024
| | 1/26/2024 | |
More Info
|
| GROUNDWORK ELECTRIC | 0 | PARTIAL APPROVED |
1/17/2024
| DAY | 1/17/2024 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | IN COMPLIANCE |
1/12/2024
| | 1/12/2024 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | IN COMPLIANCE |
12/29/2023
| | 12/29/2023 | |
More Info
|
| GROUNDWORK PLUMBING | 0 | PARTIAL APPROVED |
12/20/2023
| DAY | 12/20/2023 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | IN COMPLIANCE |
12/15/2023
| | 12/15/2023 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | IN COMPLIANCE |
12/1/2023
| | 12/1/2023 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | IN COMPLIANCE |
11/16/2023
| | 11/17/2023 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | IN COMPLIANCE |
11/2/2023
| | 11/2/2023 | |
More Info
|
| ROUGH IN FRAMING | 0 | DENIED |
10/23/2023
| DAY | 10/24/2023 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | IN COMPLIANCE |
10/18/2023
| | 10/19/2023 | |
More Info
|
| BUILDING WRAP | 0 | APPROVED |
10/6/2023
| PM | 10/6/2023 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | IN COMPLIANCE |
10/4/2023
| | 10/4/2023 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | IN COMPLIANCE |
9/20/2023
| | 9/20/2023 | |
More Info
|
| BRACE WALL | 0 | PARTIAL APPROVED |
9/20/2023
| AM | 9/20/2023 | |
More Info
|
| BRACE WALL | 0 | DENIED |
9/15/2023
| | 9/15/2023 | |
More Info
|
| BRACE WALL | 0 | CANCELLED |
9/11/2023
| | 9/11/2023 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | IN COMPLIANCE |
9/5/2023
| | 9/6/2023 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | IN COMPLIANCE |
8/17/2023
| | 8/21/2023 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | PARTIAL COMPLIANCE |
8/3/2023
| | 8/3/2023 | |
More Info
|
| FOOTING PERIMETER | 0 | APPROVED |
8/3/2023
| DAY | 8/3/2023 | |
More Info
|
| FOOTING PERIMETER | 0 | DENIED |
8/2/2023
| | 8/2/2023 | |
More Info
|
| FIELD COMMENTS | 0 | INFORMATION |
8/2/2023
| | 8/2/2023 | |
More Info
|
| FOOTING PERIMETER | 0 | INFORMATION |
8/1/2023
| | 8/1/2023 | |
More Info
|
| FOOTING PERIMETER | 0 | DENIED |
7/31/2023
| | 7/31/2023 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | IN COMPLIANCE |
7/20/2023
| | 7/20/2023 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | IN COMPLIANCE |
7/5/2023
| | 7/6/2023 | |
More Info
|
| BI-WEEKLY EROSION AND SEDIMENT | 0 | IN COMPLIANCE |
6/20/2023
| | 6/20/2023 | |
More Info
|
| FOOTING PERIMETER | 0 | PARTIAL APPROVED |
6/14/2023
| AM | 6/14/2023 | |
More Info
|
| FOUNDATION STAKEOUT | 0 | PARTIAL APPROVED |
6/13/2023
| AM | 6/13/2023 | |
More Info
|
| FOOTING PERIMETER | 0 | DENIED |
6/13/2023
| DAY | 6/13/2023 | |
More Info
|
| FOOTING POST/PIER | 0 | DENIED |
6/12/2023
| AM | 6/12/2023 | |
More Info
|
| INITIAL E AND S | 0 | APPROVED |
6/7/2023
| | 6/8/2023 | |
More Info
|