Notes:
3/24/2022 4:06:52 PM
1. THIS PLAN PROPOSES TO REMOVE 2 EXISTING UNDERGROUND DIESEL STORAGE TANKS,PUMPS AND APPURTENANCES AND OFFLOADING AND INSTALLATION OF ONE NEW 20,000 GALLON DOUBLE WALL ACT-100-U STEEL DIESEL UST AND ONE 2000 GALLON DOUBLE WALL FRP DEF UST WITH DEADMAN, PUMPS, 2" DIESEL PIPING AND 1" DEF PIPING WITH ALL APPURTENANCES AS SHOWN IN PLAN.
2. REMOVAL OF TWO EXISTING DISPENSERS, UNDER DISPENSER CONTAINMENT (UDC) SUMPS AND ALL UNDERGROUND PIPING AND CONDUITS.
3. REMOVAL OF EXISTING CONCRETE FUELING ISLAND.
4. REMOVAL OF MOTOR STARTERS, CONDUITS AND WIRING AND EXISTING VEEDER-ROOT TANK MONITOR TLS-250 CONSOLE AND APPURTENANCES FORM THE INSIDE WALL OF THE MAINTENANCE SHOP.
5. NO GRADING PROPOSED.