Notes:
10/9/2026 4:33:49 PM
the New Roanoke City Fire Training Facility (Burn Facility, ITB SOL1353). Work at existing driveway within Bennington Street SE right-of-way includes asphalt demolition, construction entrance work, curb and asphalt paving restoration, as shown on the approved civil plans and MOT Plan MOT-01. Bennington Street travel lanes and existing sidewalk to remain open. No lane, sidewalk, or detour closures anticipated. Any temporary traffic control required by field conditions will be coordinated with the City and installed per VWAPM.