Notes:
7/2/2025 3:09:05 PM
locate the existing 16" waterline before directionally drilling for installation of a new 8" sanitary line.
Once drilling in complete, EC Pace will excavate a 5' x 5' square in the sidewalk to make the sanitary sewer tie in to the existing manhole structure. The structure to be tied into is on the opposite side of Reserve Ave from RMBB's laydown yard.