Notes:
10/26/2020 2:15:22 PM
Ground floor submittal only; revision forthcoming for 2nd floor ER hallway, elevator & stairwell.
VSC to start at an 10" outlet at new proposed location for the fire water run-in and run new 10" feed through existing, unconditioned, ground floor parking garage with one 8" capped feed for future expansions. Pipe to be heat traced and insulated. GPR required for penetration through slab to pump room above for tie-in to existing fire pump.
VSC to add & relocated heads based on new wall & ceiling layouts for new, temporary offices to be located in ground floor parking garage.